After a successful Hydro Testing the water must be removed from the pipe or tank prior to the introduction of the product, in most cases the water is removed separately by dewatering by air. This is particularly the case where the services required by ‘MIZAT OIL & GAS SPECIAL SERVICES’.
Drying operations is mandatory especially for dry crude oil or dry gas services. Mizat Oil and Gas Special Services have the experienced personals and equipments to ensure the clients pipe line will meet the required drying specification. Drying operations contains removal of standing water and water vapour left over in the pipe line. Dew point meters are use to determine the moisture left in the pipe line. The dew point is different as temperature at which water vapour begins to condense out of its gaseous form at atmospheric pressure. Mizat Oil and Gas Special Services provide drying with air and drying with nitrogen.